| 
    Core layer production
  -No connecting elements for the core layer are required, therefore, no costs for strings or glue threads.
  -Glue application to both top layer and back layer, thus savings of glue and good controllability of the amount of glue
  -Glue application always from the top, thus allowing a reduced cleaning.
  -Closed-loop plant design with optimally matching modules
  
 | 
      | 
    	
		
    	
	    	  
			  
  
	 | 
     |